Ankara – Konya Fast Train Line
In total: 23 stations, 1.037,5kvA Inverter Power, 802,8kW Rectifier Power,
59.100Ah Battery Capacity
Adapazari Mithatpasa station, National Signalling Project - Trial System
Edirne – Uzunkopru, Tekirdag – Pehlivankoy stations
TCDD 3rd Zone
In total: 10 stations 405kvA Inverter Power, 320kW Rectifier Power, 3.600Ah Battery Capacity
Eskisehir – Kutahya – Balikesir ve Kütahya – Afyon Sector
In total: 39 stations, 1.433,7kvA Inverter Power, 1.500kW Rectifier Power,
The total number of batteries 1.800, 103.000Ah Battery Capacity
Tekirdag – Muratli Project
In total: 5 stations + 2 Level Crossing, 138kvA Inverter Power, 220kW Rectifier Power,
13.542Ah Battery Capacity
Malatya CTC + BP Project
Tekirdag CTC Project
IKZ Project (Irmak – Karabuk – Zonguldak)
In total: 12 stations, 594kvA Inverter Power, 428kW Rectifier Power,
1.104.000Ah Battery Capacity
Huawei
DC Systems, Batteries, 48V Power Supply, RLP, ...
Military special design Power Supply
Avea Maintenance
Vodafone
Inverter System
ZTE
Battery, RLP, ...
Telecom Companies